FCC Sets FM Translator Filing Window.

The filing window opens March 15 for new station construction permit long-form applications for the 165 “Tech Box” proposals in FM Auction 99. The window, for 165 “singleton” proposals not mutually exclusive with other proposals, closes after two weeks, on March 28.